Model: LD-FWC-00
Automatic plastic tube/ aluminum plastic tube heat sealing machine with chiller (LD-FWC-00), it is used to fill, seal and code the plastic tube and soft tube.
35pcs/min
Customized
Model: LD-FWC-00
Automatic plastic tube/ aluminum plastic tube heat sealing machine with chiller (LD-FWC-00), it is used to fill, seal and code the plastic tube and soft tube.
35pcs/min
Customized
● It can be used to fill cream and liquid, such as toothpaste, ointment, cosmetic cream, glue, and so on. The machine can trim the tail of tube beautifully.
● LD-FWC-00 tube filling and sealing machine is used to fill, seal and code the plastic tube and soft tube.
● It can be used to fill cream and liquid, such as toothpaste, ointment, cosmetic cream, glue, and so on. The machine can trim the tail of tube beautifully.
● The filling volume is 5-250 ml, if your requirement is over the range, the machine can be customized.
● With PLC and touch screen control, it is easy to operate. All the electrical parts use famous brand parts and that will ensure the good quality of the machine. It's need low maintenance cost.
● The material contact part is SS316, meeting the GMP standard.
● With piston cylinder filling system, it can be used for materials of different viscosity, and the filling precision is high.
● Using Switzerland Leiseter heater, it has high temperature precison.
● It is cooled with chiller to get the sealing good-looking and steady.
● CNC processing pumps make the filling precision high.
Item | Parameters |
Power | 220V/1P/50Hz; Customized |
Rate | 5KW |
Tube dia | 10-50mm |
Tube height | 50-220mm |
Filling volume | 5-250ml |
Filling speed | 35pcs/min |
Filling accuracy | ±1% |
Air pressure | 0.5-0.6Mpa |
Hopper volume | 30-50L (Heating and mixing is optional.) |
Nitrogen system | optional |
Size (L*W*H) | 1500*1200*1800mm |
Weight | 600kg |
Main Working Flow
● 1.Feed the tube in the mould;
● 2.Press the tube;
● 3.Fix position of the tube with mechanical eye-mark;
● 4.Fill the material into the tube;
● 5.Seal the tail with copper head;
● 6.Code the date of production on the tail;
● 7.Trim the tail of the tube;
After receiving your inquiry, We will send you the quotation as soon as possible.